A Walk Thorough of Spencer

April 7, 2019

All photos taken within seven blocks
of Park Plaza

 

I think the voters in North Landis (Spencer)
come November need to re-evaluate
the direction of our town.
We have crumbling streets and sidewalks
worn out fire trucks/police cruisers
worn out buildings and street equipment
4th street and Yadkin Avenue have been torn up
for 8 months.  I hear the town budget is going into a non spending
mode on April 15th.


GobbelGate has been a disaster

 

Below are on paved streets in downtown Spencer
The entire town has streets in this same condition

 

 

 

 

Almost stopped drain on brand new construction

 

Non compliant

 

 

Plywood has been on side of road for six months
Reported over two months ago

 

 

Four inch dip in street has been there 12 months

 

 

 

 

Please finish sidewalk.

 

 

 

 

$1,000,000.00 lawsuit

 

Please finish sidewalk

 

$1,000,000.00 lawsuit

 

 

 

 

Turned ankle

 

 

 

Non compliant on Town property

 

$1,000,000.00 lawsuit

 

$1,000.000.00 lawsuit

 

 

$1,000,000.00 lawsuit

 

 

Turned ankle

 

$1,000,000.00 lawsuit

 

$1,000,000.00 lawsuit

 

 

Non compliant. 
Dirt out of yard is washing onto sidewalk.

 

Non compliant.  This utility cut has been here for months

Bookmark 94.42  FILLING OPENINGS.
   All openings made in any street or sidewalk under the provisions of this subchapter

shall immediately, upon the completion of the work, be filled and the surface

thereof made flush with the adjacent surfaces.  Any hard surface, macadam

 or asphalt removed shall be replaced by the town at the expense of the applicant

 granted permission to open the street or sidewalk.

  Each day the opening is left unfilled in violation of this section shall constitute a separate offense.

(`94 Code, 13-21)  Penalty, see 94.99

 

 

Huge tripping hazard at top of steps

 

Non compliant.
Stone out of storm drain is washing stone into sidewalk.

 

Non compliant.
Stone out of driveway is covering sidewalk.

 

Can we finish our sidewalks?

 

Not ADA Approved on new construction.
Work on sidewalks completed almost three months ago.

 

Not ADA Approved on new construction
Work on sidewalks completed almost three months ago.

 

Not ADA Approved on new construction
Work on sidewalks completed almost three months ago.

This intersection at Yadkin and 3rd.  Old sidewalk in background was installed
several years ago and even then was not ADA approved.

 

ADA Approved

 

 

 

 

 

Back Home